Transport Canberra (TCCS) is the department of many lists. The Community Path Priority List is one of these lists. The ACT Government’s own Active Travel Standard (MIS05) for bike paths mandate a minimum 2.5 m path width in retrofit (replacement) and even wider for new paths. Many paths on the Community Path Priority List are not compliant as cycle infrastructure. Those that are compliant, belong to the strategic cycle infrastructure and are found here.

Overview

The TCCS FOI 21-126 Community Path Priority List (2021-11-17) contains 569 projects but only 40 match the minimum criteria or better for strategic cycle infrastructure. The total length of the strategic paths is close 19 km and could be built for $10.2 million. Some projects are quite short but 8 projects are greater than a kilometre in length.

total projects 569
strategic 40
% 7%
total distance 18970 m
min length 7 m
max length 2200 m

2021-11-17 FOI 21-126 Community path priority list, compiled canberrabike, 19 March 2022.

ACT Greens have adopted a wishlist approach to strategic cycle infrastructure inviting everybody to suggest where they would like the path. Community Councils have another opinion on investment priorities. The proposed active travel network shown in the Active Travel Infrastructure Practitioner Tool is not up-to-date. The TCCS strategic policy documents – ACT Transport Strategy – show the CBR Cycle Routes as a strategic network but investment in this network has largely been neglected.

The problem is not a lack of ideas but rather where to start, how to find the FTE to do the work, and including the necessary capital in the budget. We need more building instead of making new lists. Many of the bike paths on Canberran’s wish lists have been discussed since 2003. TCCS tends to procrastinate when overwhelmed with along list. This article focuses on the 39 strategic cycling projects TCCS Community Path Priority List (stand 2021-11-17).

The cost lies around $1 million for 6000 square metres of surface. For a 3 m wide path, the length of the path would be about 2 km.

Analysis by canberrabike from the data from FOI 21-126 and FOI 21-008 Community path priority list

Investment required for strategic cycle infrastructure

The total investment is estimated to be $10.2 million. Cost estimates were missing for three projects – perhaps the projects were new to the list. Good value for money!

rank 10 Dec 21 Road Suburb score estimate $000 comment
2 Luxton Street Belconnen 71 $24
3 Kingsland Parade Casey 70 $5
12 Hardwick Crescent Holt 58 $518
17 Callam Street Phillip 52 $61
24 Yamba Drive Garran 49 $394
34 Taverner Street Oxley 46 $296
40 Haydon Drive Bruce 45 $812
41 Stockman Avenue Lawson 45 $678
54 Athllon Drive Phillip 43 $347
76 Yamba Drive Mawson 39 $398
79 Wonga Street O´Connor 38 $291
90 Newcastle Street Fyshwick 37 $1338
99 Tharwa Drive Calwell 39 $162
103 Lennox Crossing Acton 35 $86
109 Athllon Drive Mawson
125 William Slim Drive Giralang 34 $33
130 Eyre Street Kingston 33 $180
142 Bugden Avenue Fadden 33 $17
146 Michael Holt Crescent Conder 32 $303 bridge
148 Katoomba Street Harrison 32 $165
153 Menindee Drive Barton 32 $158
158 Dixon Drive Holder
164 Victoria Street Hall 32 $508
200 Cotter Road Holder 31 $72
213 Schlich Street Yarralumla 30 $101
220 Julia Flynn Garden Isaacs 30 $71
242 Shannon Circuit Kaleen 29 $422
247 Athllon Drive Wanniassa 28 $26
254 Cotter Road Duffy 28 $86
291 Gungahlin Drive Mitchell 26 $5
316 Trinity Christian School Wanniassa 25 $64
351 Charles Weston School Coombs 23 $12
359 Riley Place Chifley 22 $28
370 Isabella Drive Isabella Plains 22 $203
378 Alexandrina Drive Yarralumla 21 $153
381 Hindmarsh Drive Duffy 21 $634
456 Traynor Court Melba 17 $1576 bridge
464 Kavangal Circuit Ngunnawal
503 Mackellar Crescent Cook 14 $7
Totals 39 $10234

2021-11-17 FOI 21-126 and 2021-01-28 FOI 21-008 Community path priority list, compiled canberrabike, 19 March 2022.

How much does a community path cost in the ACT? Cost of the project versus the area of the path.

Figure 1: How much does a community path cost in the ACT? Cost of the project versus the area of the path. 2021-11-17 FOI 21-126 and 2021-01-28 FOI 21-008 Community path priority list, compiled canberrabike, 19 March 2022.

Canberra.bike has been interested in costing the construction of bike paths in the ACT for some time. TCCS has the data but does not make it public. The TCCS FOI 21-126 and FOI 21-008 provide a sizeable sample of data to do so.

How much does it cost to build a bike path in the ACT?

The cost lies around $1 million for 6000 square metres of surface. For a 3 m wide path, the length of the path would be about 2 km.

The strategic cycle infrastructure

Rank Road Suburb length (m) width (m)
2 Luxton Street Belconnen 65 2.5
3 Kingsland Parade Casey 10 2.5
12 Hardwick Crescent Holt 1150 2.5
17 Callam Street Phillip 110 3
24 Yamba Drive Garran 700 2.5
34 Taverner Street Oxley 985 2.5
40 Haydon Drive Bruce 1880 3
41 Stockman Avenue Lawson 1130 2.5
54 Athllon Drive Phillip 120 4
76 Yamba Drive Mawson 1100 2.5
79 Wonga Street O´Connor 60 3
90 Newcastle Street Fyshwick 2200 3
99 Tharwa Drive Calwell 450 2.5
103 Lennox Crossing Acton 183 3
109 Athllon Drive Mawson 755 2.5
125 William Slim Drive Giralang 52 3
130 Eyre Street Kingston 400 2.5
142 Bugden Avenue Fadden 45 2.5
146 Michael Holt Crescent Conder 7 2.5
148 Katoomba Street Harrison 500 2.5
153 Menindee Drive Barton 435 2.5
158 Dixon Drive Holder 164 2.5
164 Victoria Street Hall 1085 3
185 Morshead Drive Campbell 660 4
200 Cotter Road Holder 200 2.5
213 Schlich Street Yarralumla 258 2.5
220 Julia Flynn Garden Isaacs 183 2.5
242 Shannon Circuit Kaleen 1074 2.5
247 Athllon Drive Wanniassa 60 2.5
254 Cotter Road Duffy 240 2.5
291 Gungahlin Drive Mitchell 11 2.5
316 Trinity Christian School Wanniassa 85 2.5
351 Charles Weston School Coombs 34 2.5
359 Riley Place Chifley 78 2.5
370 Isabella Drive Isabella Plains 520 2.5
378 Alexandrina Drive Yarralumla 425 2.5
381 Hindmarsh Drive Duffy 1300 2.5
456 Traynor Court Melba 210 2.5
464 Kavangal Circuit Ngunnawal 28 2.5
503 Mackellar Crescent Cook 18 2.5
Totals 40 18970 2.5 min

2021-11-17 FOI 21-126 Community path priority list, compiled canberrabike, 19 March 2022.

Figure 2: 2021-11-17 FOI 21-126 Community path priority list, compiled canberrabike, 19 March 2022.